Brick Paver Installation & Edging



Staging of product

Many paver projects will differ depending on access, website conditions, job size and naturally, the weather. These situations can have a general impact on your job from a timing stand point. Careful factor to consider should be required to determine the time to begin the paver installation. Always attempt to minimize or prevent any traffic on the ready areas.

The foreman or task manager must constantly have the products (sand/ pavers) dispersed around the job website for simple and efficient setups. Paver pallets/bundles need to be put in a way not to hinder the paver installation. The proper pallet/bundle placement can make the actual task installation easier and quicker by decreasing the total labor of handling the product.

Brick paver patterns

Pavers can be positioned in many different patterns depending upon their shape. Each paver shape will generally have a number of various hatch patterns that are provided by the producer.

Contractors need to take into consideration the traffic weight loads on their paver projects. In a lot of applications worldwide, it has been revealed that pavers laid in a herringbone pattern have carried out adequately.

Pavers that are 60 mm (2 - 3/8 in) density appropriate for pedestrian applications. Pavers that are going to be used in industrial or industrial applications ought to be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a variety of conditions that determine the starting point of a paver job.

When beginning to install pavers it is best to snap a true straight chalk line on the surface of the bedding sand or pull a real straight string line above the surface area of the bedding sand at the completed elevation of the pavers This will assist as a guide for keeping straight joint lines and will also enable the installer to make changes in the alignment of the pavers.

Buildings and concrete suppressing are usually not straight and should not be used for establishing straight joint lines. The use of string lines is vital to figure out the real straightness of the edge. As the paver installation progresses, the string lines will help reduce the requirement for little trim pieces.

These will keep a minimum joint width and allow the bed linen and jointing sand to get in in between each paver. Pavers with spacer bars are generally not laid in snug against each other since a string line will provide consistent joint spacing.

Installation of brick pavers.

One of the most commonly utilized techniques for the installation of pavers is hand installation of each paver. It is best to set up a single row of pavers along one of the real straight lines that you have actually pulled or above the bed linen sand. The finest approach is to position a paver versus another one and let it move down into the bed linen sand.

When setting up pavers on a high grade, they must be set up at the base of the grade going uphill. This will prevent the pavers from creeping as they are being laid.

On large industrial and industrial applications, hand laying pavers would not be cost effective due to the labor strength. The very best method for setting up pavers on large jobs is to install them mechanically. Using a mechanical laying device can install approximately 6000 - 7000 sq ft a day. There are a couple items a contractor should consider before installing pavers mechanically:

1.) Mechanical installers are only capable of installing pavers in certain patterns.

2.) The specialist needs to make certain that the maker is capable of production and bundling pavers in the preferred pattern on the pallets for easy mechanical installation.

Poor color mixing could result in an irregular looking installation. A lot of makers are consistent with color mixing on each bundle of pavers, but it is the specialist's duty to guarantee appropriate blending in the field.

Cutting procedures for brick pavers.

Specialists normally have 2 methods of cutting pavers. When cutting pavers wet, it will help decrease dust and will extend the diamond blades life. The operator of the brick saw ought to constantly cut the pavers away from the surface area of the paver field when cutting wet, due to the reality that the pavers will create a slurry that will stain the paver surface.

The brick saw operator needs to always wear the correct security that is needed for running a saw, such as eye, ear, respiratory and hand protection ).

Edging types

Edge restraints play a significant role in the total success of an interlocking pavement installation Edging restraints get rid of lateral movement of the pavers and hold the pavers securely together. Particularly at the outer perimeter of the paver application, without an edging restraint, your task is guaranteed to stop working gradually.

There are several various edging restraints from which professionals can choose. Normally produced edge restraints are the most commonly utilized by contractors. Made edging restraints can range from, plastic edging, steel and aluminum, timbers or precast concrete and stone. An edging type that is utilized primarily in commercial and commercial applications is poured-in-place concrete curbs. This edging restraint is usually installed by other specialists.

Edging installation.

This could result in the migration of the bedding sand and ultimate lateral movement of the pavers. If there is a possibility of losing bed linen sand in between the pavers and Patio Pavers West Palm Beach the edge restraint, then geo textile material is advised. When a gap in between the pavers and the edging exceeds 3/8" (10mm), then the area needs to be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The entire area that is to be compressed should be swept clean of any foreign things and debris that can trigger scuffing or scratching on the surface of the pavers.

In addition, it is crucial that the first compaction takes location before any jointing sand has been used to the pavers. If jointing sand is used to the pavers before compaction takes place, this can trigger a bridging issue and will not allow the joints to be totally filled with jointing sand. This can likewise avoid the pavers from being properly set into the bedding sand.

When condensing the pavers, it is recommended that you make at least 2 passes in various directions across the pavers. This will enable the pavers to be appropriately set in the bed linen sand and will require the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is very crucial to the last efficiency of the pavers. Failure to do proper compaction can result in deformations and pavement failure gradually.


Paver pallets/bundles need to be placed in a manner not to interfere with the paver installation. One of the most commonly utilized approaches for the installation of pavers is hand installation of each paver. The operator of the brick saw need to constantly cut the pavers away from the surface area of the paver field when cutting wet, due to the fact that the pavers will produce a slurry that will stain the paver surface area. Edging restraints remove lateral movement of the pavers and hold the pavers tightly together. When a gap between the pavers and the edging surpasses 3/8" (10mm), then the area needs to be filled with cut pavers.

Leave a Reply

Your email address will not be published. Required fields are marked *